This project includes the design for the construction/rehabilitation of the water system for the South End of the City.
Status:
Final Design by Bennett, Brewer and Associates, LLC
Project Funding:
City of Cumberland
Schedule:
Preliminary Engineering has been completed and Final Engineering services has started
Scope of Work
This project includes:
The development of construction alternatives to replace or rehabilitate the water system for the South End of the City which consists of approximately:
14,000 LF of 12” Water Main
5,000 LF of 4” Water Main
5,000 LF of 6” Water Main
Perform a feasibility analysis of replacing all existing 4” Water Mains with 6” Water Mains
Alternatives shall consider the use of plastic or ductile iron pipe.
Determine a minimum of three construction alternatives for the outlined system. One option must be a complete replacement of the existing pipe including determination of the proper size, type, and alignment of a new line.
Structural Lining and/or Slip Lining may be proposed
Provide a cost estimate, basic site drawing and timeline for each construction alternative.