Rehabilitation of Bridge No. A-C-06 Baltimore Street Over Wills Creek

Project Information

City Project No.:

  • 9-18-BR

Description:

  • This project is the reconstruction of the Baltimore Street Bridge. In addition, new sidewalks will be construction on both sides of the bridge and full-depth asphalt pavement.

Status:

  •  Construction 

Project Funding:

  • Maryland Department of Transportation (MDOT)
  • City of Cumberland

Schedule:

  • Construction started on February 20, 2023 and will last for 485 Calendar Days.
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

Project Scope of Work
 
The project includes placement of full‐depth asphalt and composite pavement and overlay of Baltimore Street between the intersections of Greene Street and WMSR Railroad/Canal Street. New sidewalks will be constructed on both sides of the Baltimore Street bridge. An existing drainage pipe and inlets will be removed and replaced between Bridge No. A‐C‐06 and Greene Street. There will be removal and replacement of a trench drain between Bridge No. A‐C‐06 and WSMR Railroad. Additional items of work include the replacement of the superstructure for Bridge No. A‐C‐06 on Baltimore Street over Wills Creek, construction of new beam seats, rehabilitation of existing abutments, replacement of two retaining walls with wingwalls on the West Approach, and construction two approach slabs. Utilities will be removed, relocated and replaced.